It's getting closer to floor heat every day. Just took delivery of some of the critical heat components, In the picture is the stainless steel 3 loop manifold. It's a Uponor with adjustable water flow ports, (need to adjust water flow in each loop to equally adjust for heat) ball valve shutoffs, temp gauges & assorted fitting, 2 Taco pumps - one for mounting on the boiler for water delivery - the other is thermostatically controlled for water thru the manifold, Honeywell mixing valve to drop the temp of the water going into the floor. It's bad to have to hot a water into the concrete (over 125 deg is bad)the concrete will actually deteriorate much faster. This valve is adjustable so the water temp will be much lower than the delivery temp (which is 185 deg - 195 deg). I"ll start out at about 85 - 90 deg at the manifold and see how that works. there is some experimentation involved to get it working correctly, should be fun. The valve mixes the incoming hot water with the much cooler water coming out of the floor. The green box is the thermostatically controlled relay system for the pump. So these are the parts, I'll need to build a panel to mount all this stuff.
Tuesday, January 12, 2016
Friday, January 8, 2016
RIGGING SUPPORT IN THE TRUSSES
When I built the trusses last summer, I did not build in any triangulation. They were already very difficult to build {being 30 feet long & 18 in tall made it very difficult} I did not want it any harder. Also I could not have gotten them up into place if they were any larger. Remember, these are additional to what is already in place. I decided to get additional support for the new trusses by tying them into the existing trusses with rigging. By using 3/32 steel rope (1000 lbs break), 3/8 turnbuckles (1200 lbs break) 3/16 tubing and cable clamps. I used three sections of tubing on each support. I bent the tubing around the existing trusses near the top and under the new trusses in the middle of the truss. I threaded the steel rope thru the tubing and thru the eye bolt of the turnbuckles and clamped them. I did the same going under the truss. I did this for all ten trusses. took out all the slack in the steel rope before clamping them off. Then it's tighten the turnbuckles until there is no bounce in the truss. Worked out very nicely. Will work great for additional support for sheetrock and insulation loading. The pictures makes alot easier to understand
Monday, December 28, 2015
INFRASTRUCTURE WORK, INCREDIBLY IMPORTANT BUT
it is the most tedious, patience testing, sometimes hard situation in doing a buildout. Then add in doing this in the 10 deg weather and no heat in the shop yet and the time do the simplest operation probably doubles. Just adds to the frustration. Makes it go very slowly.
Monday, December 14, 2015
GREAT!
Now that infrastructure work on the outside is done (boring, hard, and very tedious which makes it spectacularly unexciting!) I'm going back to work on the inside. I'm continuing with the electrical and at the same time going to complete the work above the ceiling. This will house the exhaust system, some additional lighting, alittle structural work for the trusses I built and installed and blowing in about 18 in worth of insulation I ask myself why I'm putting myself through all this, well when it comes time to fabricate great race car parts for our great race car it will be done in a great shop! Sure does test a persons patience tho!
Sunday, December 13, 2015
IT'S ALL BACK FILLED!
It's all back filled! Lines are in the ground (except for a short distance for cable & phone) the back filling was hard work mostly because I did alot of it in the rain. The mud sticks to everything, the shovel gets heavy, your boots weigh 15 lbs. each and I was getting wet. Anyhow it's done for now and let it all settle until spring. Also had Beaudry moved the propane tank, installed new gas line to the house and shop, supplied a new regulator for the shop. Took the gent about three hours to do all this. Charged very little for labor. I paid for the gas line, fittings, and the regulator. I feel it was a bargain since it took so long and he used a small boom truck!
![]() |
| our view off our deck. The propane tank is soon to be moved. |
![]() |
| Moving the propane tank. A very good gent from Beaudry moved the tank. He also intalled gas line for the shop and house, installed a new regulator for the shop. |
![]() |
| A very nice view now with no propane tank. |
![]() |
| Tank is now set on 4 concrete bricks that I leveled. Here the trench is back filled and the new shop regulator is visible. |
![]() |
| Visible here is the 5 in corrugated tube with the insulated pex going into the shop. I will wrap the pex with insulation for more protection. |
![]() |
| The back filled trench going to the house. at the Y, going left is the gas and right is the phone & cable. |
![]() |
| Gas to the house, cable & phone to the right-bottom of pic. |
![]() |
| Cable & phone to the house. |
Saturday, December 5, 2015
PEX IS IN THE GROUND!
Got most of the pex in the ground yesterday. It's tough to handle because it's stiff in the cool weather. I'll back fill as much as I can now, but ultimately finish that in the spring. To build a high quality, energy efficient, inexpensive to operate shop, takes time. By making use of the wood boiler, in-floor heat along with a lot of insulation in the walls and ceiling, this will be a energy efficient shop.
Thursday, December 3, 2015
PEX IS HERE
The pex arrived today. I saved about $60.00 by having it shipped to a business in town. Shipper wanted $120.00 to ship it to a home address. So now we got 135ft of insulated pex sitting in the entry way! The whole thing weighs only 120lbs, so I unloaded it off my trailer myself. Two 1 inch water lines, wrapped 3 times with insulation, inside 4 inch corrugated plastic tubing. Bury the whole thing under ground in the trench. Heat loss is minimal @ less than 1 deg per 100 feet. I'm starting to get excited! Another step closer to heat in the shop! The end goal is to have really nice shop to base our race car operation inside.
Monday, November 30, 2015
DUG THE TRENCHES
Dug the trenches for most of the under ground stuff the day after Thanksgiving. Rented a Toro Dingo with the trencher attachment. Worked great just kind of cumbersome, can't maneuver in close quarters very well, and does not turn very good when trenching. The turning when trenching may have been more related to the slippery grass than anything. Does great in a straight line. The only trench not dug is the one just past the garage for the the phone & cable. I didn't want to get to close to the pond since the tracks were already spinning on the grass.(didn't want to get stuck). I did do some by hand where it curves around into the boiler and back by the shop where the water lines enter. Anyhow there is the layout for the underground stuff, just need to get it all in the ground now.
Saturday, November 21, 2015
INGROUND STUFF FOR THE SHOP
A lot will happen in the next two - three weeks. I will be doing the under ground infrastructure install for the shop. Along with that I'm having the propane tank moved to the back of the shop (150 ft). I'll be putting in the ground, 130 ft of hot water insulated pex lines from the wood boiler for the infloor heat, approximately 175 ft of gas line, 150 ft of both telephone and cable. I'll rent a trencher for half a day or so for all the trenching. Then the attention turns to hooking all that stuff up. I'll start first with the gas line for the heater in the shop so I can get some heat in there, then turn to the infloor heat. I'll need to build an area on the wall at the back of the shop to hold all the equipment & lines for the floor heat. It'll have a stainless steel manifold with three water circuits (8 water connections, a supply in & out, 2 lines for each circuit, with flow & temp gauges), a thermostatically controlled Taco pump, mixing valve, and associated wiring for all this. They're not exciting, (inground stuff never is) but here are some pics to see whats happening.
Boiler on the right, trench will go all the way to the back corner of the shop. Just past the wood pile on the left is where the trench will split off for the cable & phone lines to enter the shop.
Standing in front of the boiler, the trench will go up towards the house around the Oak tree to the right, near where the shovel handle is. This for the gas. Just out of sight to the left is where the propane tank is presently located.
The stake at the bottom of the pic is where the trench will "T" into the long trench. This is cable and phone line At the bottom of the pic you can see the top of a stake. This again is for "T" into the long trench up to the house. On the side of the house are the boxes for phone and where the cable will be picked up. The side of the boiler is open, you can see the Taco pump & water lines that presently go into the house. Visible is the connections for the shop with valves. I'll have to dig by hand here, remove the lower side of the blue panel beneath the open door to get the water lines in. There is a little micro processor that runs a solenoid for the draft door on the front door of the boiler . Right now the draft door cycles open at 175 deg and closes at 185 deg. The max temp is adjustable, I may raise it up to 195 deg. The 10 deg swing is not adjustable so if I raise the max the lower temp automatically gets raised also. The yellow stuff is spayed foam insulation from the factory, the entire water tank is insulated. This holds approx 385 gallons of water. That alot of water to keep that hot. Underneath the black plastic is all hard wood we cut and split ourselves. It's all walnut from downed trees in a walnut grove located on a relatives farm. We're going to fire the boiler up on Thanksgiving day.
This is the view from the corner of the shop. The bricks are where the propane tank is going to be located. I made sure they are level and parallel with the shop.
Boiler on the right, trench will go all the way to the back corner of the shop. Just past the wood pile on the left is where the trench will split off for the cable & phone lines to enter the shop.
Standing in front of the boiler, the trench will go up towards the house around the Oak tree to the right, near where the shovel handle is. This for the gas. Just out of sight to the left is where the propane tank is presently located.
The stake at the bottom of the pic is where the trench will "T" into the long trench. This is cable and phone line At the bottom of the pic you can see the top of a stake. This again is for "T" into the long trench up to the house. On the side of the house are the boxes for phone and where the cable will be picked up. The side of the boiler is open, you can see the Taco pump & water lines that presently go into the house. Visible is the connections for the shop with valves. I'll have to dig by hand here, remove the lower side of the blue panel beneath the open door to get the water lines in. There is a little micro processor that runs a solenoid for the draft door on the front door of the boiler . Right now the draft door cycles open at 175 deg and closes at 185 deg. The max temp is adjustable, I may raise it up to 195 deg. The 10 deg swing is not adjustable so if I raise the max the lower temp automatically gets raised also. The yellow stuff is spayed foam insulation from the factory, the entire water tank is insulated. This holds approx 385 gallons of water. That alot of water to keep that hot. Underneath the black plastic is all hard wood we cut and split ourselves. It's all walnut from downed trees in a walnut grove located on a relatives farm. We're going to fire the boiler up on Thanksgiving day.
This is the view from the corner of the shop. The bricks are where the propane tank is going to be located. I made sure they are level and parallel with the shop.
Drawing of the trench layout. All the utilities will be in the same trench for a short distance directly behind the garage.
Monday, November 16, 2015
BEFORE IT'S REALLY COLD
The next part of the shop-home improvement project will require some coordinating. We're going to move the propane tank to the back of the shop. It's in full view of the deck off the dining room right now, so it's going to be out of sight when done. There are several things going to happen when we do this. Along with the gas line being retrenched under ground, the insulated water lines from boiler to the shop for the infloor heat, phone lines and cable antenna are all going to be buried. we will need to work with the gas company since they will actually move the tank. I will need to rent a trencher to do all this and work with gas company schedule for timing. I also will need to order and have shipped the insulated water lines. It's going to be about 110 feet from the boiler to the shop for the water lines & another 60 feet for the gas line. The cable & phone lines will split off from the shared trench with their own and enter the shop 40 feet closer. Let's hope it doesn't get to cold to soon!
Sunday, November 15, 2015
Thursday, November 5, 2015
AIR MOVEMENT - AIR EXCHANGE
One of the decisions I made when building this shop is to have very good air movement. I'm going to install 4 ceiling fans with wall mounted adjustable speed knobs. These fans are 5ft in diameter so their larger. This means that they can be on a low speed and still move a fairly large amount of air. This means a couple of things; first - they'll be quite and still move alot of air, second - with low rpms means less power draw, cheaper to operate. The goal is always to make this building as inexpensive to operate as possible. (another reason we decided to heat the shop with wood since there is heat water tubes in the floor) Sometimes this means a larger upfront cost. You'll be seeing this when I install a lot of LED lighting. LED fixtures are more expensive, but far cheaper to operate. Another air movement- air exchange idea I'm installing is a exhaust system with several vents located in the ceiling and also hookups for running vehicles in the shop. Again I'll have a speed adjustable exhaust fan. Each ceiling vent will be able to be closed off easily from the floor. By being selective, this also will leads to lesser operating costs. I'm a huge fan of air movement in a shop so one doesn't get overcome by fumes and such and just plane feels better. I'll post location of the fans over on FASTDAD'S facebook page. https://www.facebook.com/Fastdad-132790816771142/
Tuesday, November 3, 2015
Monday, November 2, 2015
Saturday, October 24, 2015
STRATEGY BEHIND ALL THIS
We (FASTMOM & I) wanted to move to the country for along time for the more active life style, see wildlife and just generally more peaceful. In order to do this the dollars had to work just right, needed to find the "just right" fixer upper and still be livable, with some sort of shop, either ready to go or something I could make into a shop. This property fit our goals. We've always been environmentally conscious so with the wood burning boiler being a renewable energy heating source was a real scoop for us. We have LP also but that will be our backup. Purchasing a used outdoor boiler with enough capacity to heat our house, FASTMOM'S garage and the shop meant we had to get a good chain saw, log splitter, and a source for logs. Now that we're in (we moved in January this year when it was like 15 to 20 below!) the goal is to get the shop built out enough to get heat in it before the deep cold sets in. It's going to be close, I'm working on it all the time and the temp is starting to cool off pretty good. The pic is our boiler this past winter, heating just the house. I'll post more pics about the shop buildout and house improvements.
Tuesday, August 25, 2015
Since my last post we closed on our property 2 1/2 acres including a good sized pond covering about 1/3 of the property. A few out buildings and a 1200 sqft shop with heat in the floor. It's never been used as anything and the in floor heat has never been utilized. I'm in the process of doing a buildout to finish the interior and make use of the in floor heat. Three reasons for purchasing this was the shop potential, the property setting and the price. The house and shop are setup for an outdoor wood burning boiler so we purchased a used one. Being in the country we have a propane tank we use as a backup if needed. The whole strategy behind this move I'll cover in another post. Since I'm retired time is my best friend to finish all this at a very resonable cost. Here are some pics to see what we have and what I'm doing. The end goal with the shop is to have a fully self supporting Formula Racing operation.
Monday, November 3, 2014
Been a while
Refreshing my memory about login, posting etc. A lot has change since I last posted. We're in the middle of moving, staying at relatives until a new home is purchased. We have an offer in on a property with a nice size shop, separate garage and a nice home all on 2 1/2 acres. More later.
Thursday, March 7, 2013
MIND WAIT
Ok, so now the proposal is finished. Did all the home work, came up with what we thought were some very clever ideas. Got it all put down on paper so the concept has some words and meaning behind it. All the actions we could take are not so overwhelming that it looks impossible. It will take an increndible amount of work for it to perform properly so the outcome is correct, but it is all possible. At that point delegence of perception and execution with keeping your eye on the ball is critical. So it's been handed in so now it's wait. Mind wait - it works the BRAIN ASSET hard.
Tuesday, February 26, 2013
HAMMERFORMING A COUPLE OF PARTS
| Now heat the aluminum very carefully, just enough to remove the soot. This will take it to about 750 -800 deg! The aluminum is very close to melting so be carefull. |
| Soot is gone the aluminum sagged because it was so close to meltdown! |
| Now it's relatively easy to shap around the wood block I made for the final shape. The block is exactly the proper dimensions as the area of the rool bar. |
| Here it's easier to see the shape I made relative to the roll bar. The form has to be exactly the same dimensions, since the aluminum will wrap around it. |
| Final shape, this will fit exactly. |
| another view, easier to see. |
| Hammerformed the aluminum using the hard wood tool I made. The wood is a hard maple. |