Monday, December 28, 2015
INFRASTRUCTURE WORK, INCREDIBLY IMPORTANT BUT
it is the most tedious, patience testing, sometimes hard situation in doing a buildout. Then add in doing this in the 10 deg weather and no heat in the shop yet and the time do the simplest operation probably doubles. Just adds to the frustration. Makes it go very slowly.
Monday, December 14, 2015
GREAT!
Now that infrastructure work on the outside is done (boring, hard, and very tedious which makes it spectacularly unexciting!) I'm going back to work on the inside. I'm continuing with the electrical and at the same time going to complete the work above the ceiling. This will house the exhaust system, some additional lighting, alittle structural work for the trusses I built and installed and blowing in about 18 in worth of insulation I ask myself why I'm putting myself through all this, well when it comes time to fabricate great race car parts for our great race car it will be done in a great shop! Sure does test a persons patience tho!
Sunday, December 13, 2015
IT'S ALL BACK FILLED!
It's all back filled! Lines are in the ground (except for a short distance for cable & phone) the back filling was hard work mostly because I did alot of it in the rain. The mud sticks to everything, the shovel gets heavy, your boots weigh 15 lbs. each and I was getting wet. Anyhow it's done for now and let it all settle until spring. Also had Beaudry moved the propane tank, installed new gas line to the house and shop, supplied a new regulator for the shop. Took the gent about three hours to do all this. Charged very little for labor. I paid for the gas line, fittings, and the regulator. I feel it was a bargain since it took so long and he used a small boom truck!
![]() |
our view off our deck. The propane tank is soon to be moved. |
![]() |
Moving the propane tank. A very good gent from Beaudry moved the tank. He also intalled gas line for the shop and house, installed a new regulator for the shop. |
![]() |
A very nice view now with no propane tank. |
![]() |
Tank is now set on 4 concrete bricks that I leveled. Here the trench is back filled and the new shop regulator is visible. |
![]() |
Visible here is the 5 in corrugated tube with the insulated pex going into the shop. I will wrap the pex with insulation for more protection. |
![]() |
The back filled trench going to the house. at the Y, going left is the gas and right is the phone & cable. |
![]() |
Gas to the house, cable & phone to the right-bottom of pic. |
![]() |
Cable & phone to the house. |
Saturday, December 5, 2015
PEX IS IN THE GROUND!
Got most of the pex in the ground yesterday. It's tough to handle because it's stiff in the cool weather. I'll back fill as much as I can now, but ultimately finish that in the spring. To build a high quality, energy efficient, inexpensive to operate shop, takes time. By making use of the wood boiler, in-floor heat along with a lot of insulation in the walls and ceiling, this will be a energy efficient shop.
Thursday, December 3, 2015
PEX IS HERE
The pex arrived today. I saved about $60.00 by having it shipped to a business in town. Shipper wanted $120.00 to ship it to a home address. So now we got 135ft of insulated pex sitting in the entry way! The whole thing weighs only 120lbs, so I unloaded it off my trailer myself. Two 1 inch water lines, wrapped 3 times with insulation, inside 4 inch corrugated plastic tubing. Bury the whole thing under ground in the trench. Heat loss is minimal @ less than 1 deg per 100 feet. I'm starting to get excited! Another step closer to heat in the shop! The end goal is to have really nice shop to base our race car operation inside.